My doctor boss was out of the office on Monday and I feverishly sewed most of the day to get the Rise Up quilt top finished. While the HSTs were all made, sewing them into rows was quite time intensive. I used various parts of the Log Cabin Loonies blocks as leader-enders, pleased to be working on those again.
I couldn't help myself, I had to make some single fabric arrows with the greens. Can you spot all six?
Constructing the backing was frustrating as usual whenever cobbling together a lot of leftovers. I had bought two 1 yard pieces of solid green, but naturally needed three.
At one point the backing was in timeout after a miscut. I had to retire to another room with caffeine and snacks until the backing decided to behave. At guild, after show and tell, I handed the quilt off to my sister to longarm for me. Meanwhile I will cut the binding and get it ready to apply before the end of the month deadline.
It has been four weeks since my shingles outbreak and I'm feeling much better, even good enough to face the disaster of my cutting table scraps and clutter. I sorted and discarded, filled a bag with strings and chunks to take to guild, and will shove the rest into the precut bins. There was also a good look through the project bins and rewriting of the WIPS in this year's Bullet Journal.
The list of 26 (!!) projects was in no particular order, but I do have some favorites and priorities on these pages--which are mostly quilts for ME. However, our guild is having a sew-in for baby quilts next month and there are a couple of good options for that from my list. Primarily prepping fabric and cutting stands out for many of the projects. Two quilts I "owe" as gifts are top of the list. Quilt tops I've completed need scheduling time with my sister. I know she wants me to get comfortable enough with her longarm machine not to need her there when I want to quilt; I'm not confident I'll ever be!

